ZeeLung* Membrane Aerated Biofilm Reactor with zeeDENSE* removal

活性污泥的超强化

ZeeLung MABR with zeeDENSE is an innovative technology that combines ZeeLung MABR with continuous flow densification for activated sludge plants that need to expand both biological and hydraulic capacity by up to 50% while simultaneously improving nutrient removal.

概览

活性污泥厂通常存在两个限制处理能力的工艺瓶颈:

生物反应槽的性能受槽容积和系统中细菌存量的限制,因而限制了该工艺所能达到的最高营养物去除量。

二级澄清池的性能受澄清池表面积和混合液沉淀特性的限制。

ZeeLung MABR with zeeDENSE breaks through both bottlenecks by combining two proven intensification technologies – ZeeLung MABR & densification.

优势包括:

  • 提高生物反应器和二级净化器的处理能力
  • 改善沉淀
  • 加强营养物去除,包括生物除磷
  • 温室气体减排
  • 等等

市政废水处理应用:

  • 占地面积受限而产能需求增加的工厂
  • 需要改善营养物去除的工厂

工作原理

ZeeLung MABR with zeeDENSE couples the synergies of ZeeLung MABR with continuous flow densification.

ZeeLung MABR加强了现有生物反应槽的营养物去除。浸泡于混合液中的ZeeLung盒可支持生物膜的生长,增加系统中营养物去除细菌的数量。ZeeLung介质可通过“呼吸”(在不使用气泡的情况下将氧气转移到生物膜中)降低能源消耗,并减少N2O排放。ZeeLung可以提供高达50%的容量扩展,同时减少高达75%的曝气能量,并减少温室气体排放。

致密化加强了二次澄清。水力旋流技术利用重力选择压力来保留密集的生物质,并有选择地废弃密度较小的生物质,包括丝状细菌。废弃的活性污泥或混合液通过zeeDENSE系统进行处理,致密的生物质被送回生物反应槽,而密度较低的生物质则从该过程中废弃掉。其结果是改善了混合液的沉淀特性,从而使二次澄清的强化程度达到50%。

ZeeLung MABR with zeeDENSE is tailor-made for the upgrade of activated sludge plants with modularity, process flexibility and speed of implementation. The combination of densification and ZeeLung MABR creates a wastewater technology more efficient than ever without having to increase your plant footprint.

 

案例研究

ZeeLung* MABR with zeeDENSE* Intensify Wastewater Treatment at the Yorkville-Bristol Sanitary District

The Yorkville-Bristol Sanitary District faced multiple challenges including capacity constraints from population growth and industrial loads, space limitations, and phosphorus discharge compliance requirements. In 2017, they implemented ZeeLung MABR technology as a solution. When increased flow created new clarifier capacity challenges, the facility was further upgraded in 2023 with ZeeLung MABR with zeeDENSE technology providing a 40% increase in secondary clarifier capacity without new construction and 75% chemical savings from optimized biological phosphorus removal.

ZeeLung* MABR with zeeDENSE* Intensifies Nutrient Removal at United Utilities Bolton Wastewater Treatment Works

United Utilities facility in Bolton, UK, faced challenges to meet stricter ammonia limits while increasing plant flexibility, supporting sustainability goals, and enhancing climate change resilience. They chose ZeeLung MABR with zeeDENSE technology as the solution, making Bolton WWTP the world's largest MABR installation at the time of construction.

ZeeLung* MABR with zeeDENSE* Upgrade for Nutrient Removal at Intensification in Gold Coast Australia

The Elanora facility faced challenges due to regional population growth, requiring capacity expansion to 144,000 PE over 25 years, while conventional upgrades were cost-prohibitive and limited by space constraints. ZeeLung MABR with zeeDENSE technology was chosen as the solution, offering increased hydraulic capacity and enhanced nutrient removal without requiring new concrete tank construction.